Back to 35 MW Package

Start-Up

0%

Unit start sequence

Step 1 of 5

PHASE 1 – Safety Walk & Pre-checks

Confirm area is safe before energizing. Refer to OEM manual and site procedures.

Do not energize the package if personnel are still inside the enclosure.

HMI Reference
action

Walk the DT35 package. Confirm all work permits are closed, LOTO removed where required, and all doors/guards are in their normal operating position.

monitor

No loose tools, no trip hazards, no open electrical enclosures.

0/2 items checked