Back to 35 MW Package
Start-Up
0%Unit start sequence
Step 1 of 5
PHASE 1 – Safety Walk & Pre-checks
Confirm area is safe before energizing. Refer to OEM manual and site procedures.
Do not energize the package if personnel are still inside the enclosure.
HMI Reference

action
Walk the DT35 package. Confirm all work permits are closed, LOTO removed where required, and all doors/guards are in their normal operating position.
monitor
No loose tools, no trip hazards, no open electrical enclosures.
0/2 items checked