Back to 34 MW Package
34 MW Normal Stop
0%M1→M2, open 52G, stop turbine & BSDG
Step 1 of 4
Step 1 – Start BSDG & Transfer Load to M2
Before stopping the turbine, transfer the LV bus back to the Black Start Diesel Genset.
action
Notify site supervisor and coordinate with connected equipment operators.
action
Start the Black Start Diesel Genset (BSDG) from the HMI.
monitor
Monitor BSDG: confirm it reaches rated speed and voltage.
action
Send M1→M2 switching command from HMI. PLC in MCC1 closes M2 and opens M1.
monitor
Monitor LV busbar — confirm it is now fed from BSDG (M2).
0/5 items checked