Back to 34 MW Package

34 MW Normal Stop

0%

M1→M2, open 52G, stop turbine & BSDG

Step 1 of 4

Step 1 – Start BSDG & Transfer Load to M2

Before stopping the turbine, transfer the LV bus back to the Black Start Diesel Genset.

action

Notify site supervisor and coordinate with connected equipment operators.

action

Start the Black Start Diesel Genset (BSDG) from the HMI.

monitor

Monitor BSDG: confirm it reaches rated speed and voltage.

action

Send M1→M2 switching command from HMI. PLC in MCC1 closes M2 and opens M1.

monitor

Monitor LV busbar — confirm it is now fed from BSDG (M2).

0/5 items checked