34 MW Start-Up
0%Gas turbine start, 52G close, M2→M1
Step 1 of 6
Step 1 – Verify Permissives
All Crank and Start Permissives must be satisfied on the TCP HMI before issuing a start command.
action
Open TCP HMI → Debugging Interface → Crank Permissives screen.
monitor
Verify all Crank Permissives are satisfied (green). Address any unsatisfied permissive before proceeding.
0/2 items checked