Back to 34 MW Package

34 MW Start-Up

0%

Gas turbine start, 52G close, M2→M1

Step 1 of 6

Step 1 – Verify Permissives

All Crank and Start Permissives must be satisfied on the TCP HMI before issuing a start command.

action

Open TCP HMI → Debugging Interface → Crank Permissives screen.

monitor

Verify all Crank Permissives are satisfied (green). Address any unsatisfied permissive before proceeding.

0/2 items checked