Back to 13 MW Package

SMT130 Load Setpoint

0%

Load setpoint (kW limit)

Step 1 of 2

Load setpoint limit in kW

kW control mode is default in grid operation. Adjust from Setpoints screen in the TCP. Refer to OEM manual.

monitor

Confirm the 15 kV Circuit Breaker is closed and the unit is generating load.

action

On the TCP window: navigate to the GENERATOR or Control System screen.

monitor

Verify the active control mode in the 'Speed/Load Control Mode' box.

action

Press the SETPOINTS button to open the setpoints window.

action

Locate the 'kW Setpoint' or 'Speed' field. Tap the current value to open the dialog.

action

Enter the new desired load value in kW. MAX LIMIT: ~13,000 kW (ISO) — do not exceed.

monitor

Press OK to confirm. Verify that the new value appears in the window.

monitor

Monitor: generator load should move gradually toward the new setpoint.

action

Do not exceed system frequency limits while adjusting speed/load setpoints.

action

Record the programmed setpoint, time and operational condition.

0/10 items checked