Back to 13 MW Package

SMT130 Pre-Start

0%

Pre-start checks & AC power procedure

Step 1 of 3

Step 1 – Pre-Start Walk-Around

Contact maintenance and confirm all work permits are closed and no DANGER / DO NOT OPERATE tags are on any equipment before energizing.

HMI Reference
action

Walk around both frames (Turbine Frame and Generator Frame). Confirm all eight sections are accessible and closed.

action

Verify no maintenance tags on any equipment. Confirm all maintenance items are complete.

action

Confirm Turbine Exhaust preparation for operation is complete.

action

Confirm Fire Suppression System preparation for operation is complete.

action

Verify combustor and exhaust collector drain caps are open — required during operation.

action

Confirm TAI (Turbine Air Inlet) module is installed and secured.

monitor

No fuel leaks, oil leaks, or gas leaks at any connection point.

0/7 items checked