Back to 6.4 MW Package
SMT60 Pre-Start
0%Pre-start checks & preparation
Step 1 of 4
Step 1 – UCP Activation
Activate the Unit Control Panel and verify local control before any start sequence.
action
On the UCP software, click the TCP button to open the Turbine Control Panel window.
HMI Reference

action
If [Customer] shows as active control, click the Customer Disable button and click Ok.
monitor
[Local] shows as the active control on the TCP window.
0/3 items checked