Back to Trailered Pressure Regulation System

PRS Maintenance
0%Weekly → 3-year maintenance
Step 1 of 6
Weekly – Visual Inspection
Weekly maintenance summary. Refer to OEM manual and site schedule.
action
Walk around the entire PRS.
action
Open back doors — check for signs of damage or deterioration to equipment and hoses.
monitor
High-pressure inlet hoses show no signs of wear or kinking.
monitor
No audible gas leaks or visible damage at connections or PSVs.
action
Check fuel gas scrubber for liquid — open petcock, then close.
action
Check 67CFR regulator for liquid — open petcock at bottom, then close.
action
Check EZH Pilot Filter for liquid — open drain valve, drain, then retighten.
action
Report any physical damage to supervisor.
action
Repair all leaks before returning to service.
0/9 items checked